Deputy Economy Minister says steps taken for Anaklia Port to become fully operational by 2029
“The Anaklia Deep Sea Port project is proceeding according to the established timeframe; dredging works have been completed, construction of the breakwater is underway, and steps are being taken to ensure the port becomes fully operational by 2029,” said Tamar Ioseliani, Deputy Minister of Economy and Sustainable Development.
According to the Deputy Minister, the railway and roads components are equally significant.
“The tender for the railway construction has already been announced, which will enable the connection of the Anaklia Port to the central railway network by 2029, allowing for the integration of the Anaklia Port into the unified national network,” she said.
Tamar Ioseliani emphasized Georgia’s strategic location and increased cargo turnover.
“Historically, Georgia has served, and continues to serve, as a vital link between Europe and Asia; consequently, the development of the transport and logistics sector is of great importance to us. The figures concerning the corridor are also significant. In this regard, it is worth noting that 2026 stands out as a record-breaking year: data from the first 10 months show growth across all modes of transport and, by extension, across all categories of cargo,” she said.
Deputy Minister of Economy mentioned the recent research of the World Bank, based on which, by 2040, cargo turnover along the Middle Corridor will quadruple; consequently, major projects in this direction are already underway.
“I would highlight a strategic project of paramount importance to us, the construction of the Anaklia deep-sea port and its ongoing development, which connects the entire Middle Corridor to the Black Sea; in this regard, Georgia is taking the necessary steps,” she concluded.